Services for solving problems on boiler K5
For paper mill VIPAP Videm Krško we prepared design documentation (design for construction permit and as built documentation) and we lead the process for construction and operating permit as well as carried out professional supervision over residues (ashes, dross and slag) from the combustion in boiler K5 transportation, storage, dosage, disposition and dampening system.
The system consists of:
-
a silo for the storage of residues from the combustion
-
a system for transportation of residues from the combustion from boiler to silo and loading the silo
-
a system for unloading and moistening of residues from the combustion
-
drives, automation and control system and auxiliary equipment
Picture: Silo
The capacity of the new silo is 300 cubic meters, net capacity (mass) of silo contents is up to 300 t, gross mass of the metal silo construction with content is approximately 320 t, the height of a metal load-bearing construction is 10.90 m, the surface is approximately 25 square meters, the height of the top of reservoir is 21 m and the height of the elevator for loading with pipeline is 25 m.
The system for transportation of residues of the combustion from boiler to silo and loading the silo consist of screw conveyers, pouring shafts, the elevator and dust removal system. The system for unloading and moistening consists of closing device, dosage equipment, double screw conveyer and moistening device.
The drives are supplied and operated with electricity from boiler K5; visualization on DTS is also performed.
Project Manager: Franc Katič, M.Sc.E.E.